Recover from delays by changing only what is necessary.
Preserve critical operations.Adjust only affected tasks.Maintain stability on the shop floor.
But in traditional systems, even a small disruption forces a full reschedule.
• Entire schedules must be recalculated • Critical operations are unintentionally changed • The shop floor becomes unstable
Our patented control logic determines what should change and what should remain fixed.
Instead of rebuilding the entire schedule, only affected tasks are adjusted.
Before
A single delay triggers full rescheduling → Entire production plan is disrupted
After
Only affected tasks are adjusted → Critical operations remain intact → Production continues with minimal disruption
• Reduce production disruption • Improve on-time delivery • Minimize rescheduling cost • Stabilize shop floor operations